top of page
Six HEMP shielded facilities, including two at a remote island in the Bering Sea. The total square footage was in excess of 85,000 SF and included 24 HEMP doors, 89 RF electrical filter cabinet assemblies with MOVs, multiple waveguide penetrations, Pulse Current Injection Testing, RF Attenuation and SELDS testing. Completed 2004.
bottom of page